Certified Argo Project Associate (CAPA) free question 1 / 10 · Domain 1: Argo Workflows
A steps template contains three entries. The first inner list holds step A on its own, the second inner list holds steps B and C, and the third holds step D. In what order do they run?
- A, B and C start together, and D starts after A has completed without waiting for B or C
- B and C run first in parallel, and A and D run afterward in sequence
- A runs first, then B and C run in parallel, and D runs after both B and C have completed
- A, B, C and D run one after another in the order they are written, because the entries are sequential steps
Show the answer and explanation
Answer: C
Why this is correct
The Core Concepts page says a steps template is a list of lists: outer lists run sequentially and inner lists run in parallel. Here the first outer entry holds only A, so A runs alone and must complete first. The second outer entry holds B and C, which start together. The third outer entry holds D, which starts only when the second entry has finished, meaning after both B and C.
Why the other options are wrong
"A, B, C and D run one after another in the order they are written, because the entries are sequential steps" … That would be the result only if each step sat in its own outer list entry. B and C are in the same inner list, and inner lists run in parallel.
"A, B and C start together, and D starts after A has completed without waiting for B or C" … The outer lists run sequentially, so the second list cannot start until the first has completed. D belongs to a later list and waits for the whole second list.
"B and C run first in parallel, and A and D run afterward in sequence" … Order follows the outer list. The list that holds A comes first, so A is not delayed until after B and C.
Key points
Outer list means sequence, inner list means parallel. To run an inner list one item at a time you need the Synchronization feature.