ISC2 Systems Security Certified Practitioner (SSCP) free question 5 / 10 · Domain 3: Risk Identification, Monitoring and Analysis
A risk analyst compares two threats. Threat one is very likely but would cause a brief, minor disruption. Threat two is unlikely but would stop a core business process for weeks. According to NIST SP 800-30, which statement explains why the analyst cannot rank them by likelihood alone?
- Risk is determined by the severity of the vulnerability, because the weakest component sets the overall level
- Risk is set by the asset owner's preference, because owners decide how much loss they can tolerate
- Risk is measured by the number of past incidents, because history is a reliable predictor of loss
- Risk combines likelihood and potential impact, because risk is a function of those two factors
Show the answer and explanation
Answer: D
Why this is correct
SP 800-30 describes a generic risk model with key risk factors and then states that risk is a function of the likelihood of a threat event's occurrence and the potential adverse impact should the event occur. A frequent but minor event and a rare but catastrophic event can therefore carry comparable risk. The definition accommodates many kinds of adverse impact, from damage to reputation to inability to execute a mission process, which is why impact must be estimated alongside likelihood.
Why the other options are wrong
"Risk is determined by the severity of the vulnerability, because the weakest component sets the overall level" … SP 800-30 treats vulnerabilities as one risk factor. The definition itself is built on likelihood and impact, not on a single weakness.
"Risk is measured by the number of past incidents, because history is a reliable predictor of loss" … Past incidents can inform the likelihood estimate, but the definition does not reduce risk to a count of earlier events.
"Risk is set by the asset owner's preference, because owners decide how much loss they can tolerate" … Tolerance is the level of risk that is acceptable. It is compared with risk, but it does not define how risk is calculated.
Key points
Risk is likelihood combined with impact. Ranking by either factor alone can misplace the priorities.